Delta Energy runs cable installation from route planning through to final testing. Our capabilities include:
+966 54 174 4422
Cable pulling is the controlled installation of power cables through trenches, ducts, or cable tray systems, pulled to route without exceeding the tension and bending limits that protect the cable’s insulation. Done right, it covers everything from route survey and trench preparation to laying, jointing, and backfilling, so the cable performs to its full design life once it’s energized.
Substations, distribution networks, and industrial facilities across Saudi Arabia depend on properly pulled LV, MV, and HV cable runs to keep power moving without faults or downtime.
Delta Energy runs cable installation from route planning through to final testing. Our capabilities include:
Route investigation and trial pit surveys to plan the safest, most efficient path.
Trench and duct preparation, plus tray and ladder rack installation for above-ground runs.
Nose pulling, hauling, and bond pulling methods matched to site conditions, for cable runs up to 380kV.
Sand bedding, warning tape placement, and backfilling to approved trench specifications.
Certified jointers handle terminations and splicing for LV, MV, and HV cable.
Post-installation testing and fault location to confirm the run is ready to energize.
Long-run, high-voltage cable installations pulled and tested by experienced crews.